2.4m跨声速风洞带TPS测力试验数据精度要求分析

熊能, 林俊

熊能, 林俊. 2.4m跨声速风洞带TPS测力试验数据精度要求分析[J]. 实验流体力学, 2004, 18(3): 42-46. DOI: 10.3969/j.issn.1672-9897.2004.03.009
引用本文: 熊能, 林俊. 2.4m跨声速风洞带TPS测力试验数据精度要求分析[J]. 实验流体力学, 2004, 18(3): 42-46. DOI: 10.3969/j.issn.1672-9897.2004.03.009
An analysis of data accuracy of force measurement testing with TPS in 2.4m transonic wind tunnel[J]. Journal of Experiments in Fluid Mechanics, 2004, 18(3): 42-46. DOI: 10.3969/j.issn.1672-9897.2004.03.009
Citation: An analysis of data accuracy of force measurement testing with TPS in 2.4m transonic wind tunnel[J]. Journal of Experiments in Fluid Mechanics, 2004, 18(3): 42-46. DOI: 10.3969/j.issn.1672-9897.2004.03.009

2.4m跨声速风洞带TPS测力试验数据精度要求分析

详细信息
  • 中图分类号: 51-1499/V

An analysis of data accuracy of force measurement testing with TPS in 2.4m transonic wind tunnel

  • 摘要: 成功建立带TPS风洞测力试验技术的一个关键问题是确保试验数据具有足够的精度,必须精细地分配误差.为获得满足工程需要的高精度测力试验数据,给出一种基于计算机符号运算的子程序,完成不确定度计算过程中公式自动推导、计算.最后通过对TPS风洞试验数据精度的敏度分析,给出了某运输机在2.4m跨声速风洞TPS试验中各环节的误差分配要求.
计量
  • 文章访问数:  97
  • HTML全文浏览量:  23
  • PDF下载量:  5
  • 被引次数: 0
出版历程
  • 刊出日期:  2004-02-29

目录

    /

    返回文章
    返回
    x 关闭 永久关闭